Queen Anne’s School Phase 2

Phase 2 of the Victorian block refurbishment at Queen Anne’s School, Caversham. This phase of the project follows on directly from the Phase 1 works. The main block North of the Chapel contains the music department completed under the Phase 1 activity.

Phase 2 consists of refurbishment and re-modelling of the existing recital hall, kitchen stores, lightwell, classrooms and a small extension to create a new main entrance hall.

The recital hall was once a common room, Café six for the pupils and is now an incredible Recital hall with bespoke lighting design to enhance the space.

Client

Feltham Construction
https://www.felthamgroupltd.co.uk

Image

PROJECT VALUE

£210,000

Contract Period

11 months

Work Carried Out

Strip out of existing redundant services

Main and sub-main distribution

Internal lighting

Emergency lighting

Lighting controls

Small power system

Voice/data structured wiring system

Fire detection and alarm system

Intruder alarm system

CCTV system

Wiring associated with mechanical plant

Testing and commissioning of all electrical services