Project case study

Project Overview

Windsor Castle Admissions and Education Centre

The Future Programme at Windsor Castle was to increase public access to the Castle, specifically, the ground floor of the State Apartments, reinstate the Georgian Entrance Hall and link the north and south side entrances to provide new visitor routes through the State Apartments.

To facilitate the additional visitors and provide additional educational and learning resources the Admissions Building ad Learning Centre, a new building within the Pug Yard was redeveloped as part of the project.

The existing admissions facility, together with the conversion and extension of the existing conservation workshops  was used to provide for the relocation of an enlarged Learning Centre. This work includes the conversion of a listed building to the East of the Pug Yard, to provide proposed dining hall facilities. The demolition of buildings aligning the western side of the Pug Yard, allow for the development of a new two storey Learning Centre Building.

Client

Feltham Construction
https://www.felthamgroupltd.co.uk

Image

PROJECT VALUE

£1,100,000

Contract Period

26 months

Work Carried Out

Design meetings with elements of design input

Client liaison.

Mains distribution

Site wide power distribution

Small power

Machine Power systems

Lighting installation

Lighting control system

External lighting

Security Systems, Access Control, Intruder Alarm, CCTV

Fire Alarm systems

Disabled Refuge Systems

Communications Systems

Coordination with Mechanical services

Earthing & Bonding

Test & Commissioning