Project case study

Project Overview

Eton College

The project comprises the refurbishment of the Queen’s School Science Laboratories at Eton College.

The college buildings were occupied throughout the project with areas being completely under phase control. Substantial enabling works were carried out to allow the existing services to be removed under safe controls.

The works comprised of interesting lighting integrated into the ceiling make-up, bespoke sign lighting, mood & decorative lighting to the underside of the floating walkways within the ground main entrance. It was exciting to be a part of this project.

Client

Image

PROJECT VALUE

£630,000

Contract Period

18 months

Work Carried Out

Design meetings with elements of design input

Client liaison.

Mains distribution

Site wide power distribution

Small power

Lighting installation

Lighting control system

External lighting

Security Systems, Access Control, Intruder Alarm, CCTV

Fire Alarm systems

Communications Systems

AV Systems

Coordination with Mechanical services

Mechanical power

Earthing & Bonding

Test & Commissioning