Project case study

Project Overview

Logistics City Basingstoke

The development  at Logistics City consists of three industrial units. All of the units are provided with a core compromising: toilets, circulation areas and a mezzanine office which was fitted-out in its entirety. The development has a 10,050 m2 Gross External Area.

The main warehouse areas are fitted out with mains distribution systems, power to roller shutters and smart LED lighting.

The LED luminaires consisted of continues LED light system suspended from continery wires. Each section was controlled via movement sensors on approach.

Client

Kier Construction
https://www.kier.co.uk

Image

PROJECT VALUE

£490,000

Contract Period

15 months

Work Carried Out

Design meetings with elements of design input

Client liaison.

Mains distribution

Site wide power distribution

Small power

Lighting installation

Lighting control system

External lighting

Communications Systems

AV Systems

Coordination with Mechanical services

Mechanical power

Earthing & Bonding

Test & Commissioning